Increase Bitcoin Mining Efficiency and Cut Costs

Increase Bitcoin Mining Efficiency and Cut Costs

Why chose ID34 Mining's Engineering Services?

Key Takeaways:
| Cost Savings | Save 25-30% on electricity delivery costs with GP Delivery. |
| Enhanced Efficiency | Optimize power quality and reduce energy waste with the Powerhouse unit. |
| Reliability | Protect your operations from electrical issues and extend equipment lifespan. |

Introduction

In the competitive world of Bitcoin mining and data center operations, managing operational costs and ensuring reliable power quality are paramount. ID34 Mining, in collaboration with our energy broker partners, offers a comprehensive solution to help you achieve both. By leveraging General Primary (GP) Delivery and the innovative Powerhouse electrical control system, we provide a pathway to significant cost savings and enhanced operational efficiency.

What is General Primary (GP) Delivery?

General Primary Delivery is an electricity delivery model that offers substantial discounts for high-usage customers. Unlike General Secondary Delivery (GSD), which requires utility-owned transformers to step down voltage, GP Delivery allows customers with their own on-site transformers to benefit from lower delivery charges. This can translate into a 25-30% reduction in delivery costs, freeing up funds for other critical investments.

Introducing the Powerhouse Unit

The Powerhouse is a revolutionary electrical control system that combines multiple technologies to optimize power quality and efficiency.
Key features include:
- Voltage Balancing and Surge Protection: The system monitors and corrects voltage imbalances, protecting equipment from spikes and surges up to 50,000 Volts.
- Energy Efficiency: By improving power factor and reducing KVA and KVAR, the Powerhouse helps lower overall electricity consumption and costs.
- Harmonics Reduction: Optional filters can further enhance power quality, reducing electrical waste and extending equipment lifespan.

Case Studies and Real-World Impact

1. Kawasaki Motors: Improved power factor from .84 to .95, reduced amperage by 15%, and achieved a 6.5% decrease in KWH usage.
   
2. Unilever Ice Cream Plant: Voltage increased by 6 volts, amperage decreased by 17%, and achieved over 15% demand savings during testing.

How to Get Started

To explore the benefits of GP Delivery and the Powerhouse unit for your operations, simply provide us with a recent electricity bill. Our team will conduct a thorough analysis and, if suitable, schedule an on-site review. This initial assessment is risk-free and can reveal significant opportunities for savings and efficiency improvements.

Conclusion

Partnering with ID34 Mining and our energy broker affiliates not only enhances your Bitcoin mining and data center operations but also ensures you are leveraging the most advanced and cost-effective energy solutions available. Contact us today to start your journey towards optimized energy usage and substantial cost savings.

Ask us how we can accomplish a conversion to General Primary Delivery with no out of pocket expenses.

For more information on how our solutions can benefit your business, or for information on switching to General Primary Delivery, contact us at https://id34mining.com
Back to blog